Thursday, March 10, 2011

Inside work being done

This is the wall in BR#3 after it has been moved one foot to make way for more room in the main bathroom.


Laundry closet at the top of the stairs in the second floor hall.

Enlarged closet in BR2 with the door re-installed. That extra 18" will make such a difference!


Bathroom floor and wall after the wall was moved one foot. They will take a floorboard from the kitchen to use in the bathroom.

We've had quite a bit of rain and more is coming our way the rest of today, so the workers are doing inside stuff. I did meet the Appalachian Power guy there this morning to discuss the new service that will be installed for the house (and run underground). Hanshill seems to have gotten more rain than we did in town. When I left, Josh was getting ready to re-hang the closet door in BR3.